LEED Project - Building Flush


Challenge
To prevent indoor air quality problems resulting from the construction / renovation process in order to help sustain the comfort and well-being of construction workers and building occupants.

Objective
During construction, to:
  • Meet or exceed the Indoor Air Quality (IAQ) Guideline for occupied buildings under construction
  • Protect stored on-site or installed absorptive materials from moisture damage
  • Provide filtration for air handlers and air movement systems
  • Correct deficiencies which adversely affect IAQ (e.g. moisture in HVAC systems, water damaged walls, etc)
After construction and all interior finishes installed, and prior to occupancy to:
  • Provide a building-flush for the entire building by supplying a total air volume, specified for quantity of volume, filtration quality, cubic feet per minute, temperature, and relative humidity
After construction and all interior finishes installed, and overlapping with occupancy to:
  • Provide a building-flush as specified
Solution
A designed system which during the building-flush process:
  1. Is portable and flame-free
  2. Reduces or eliminates the risk of fire in conducting the building-flush
  3. Does not create any interior toxic combustion gasses
  4. Does not add moisture to the interior
  5. Is energy-efficient
  • Hydronic delivery system minimizes energy-consumption and optimizes energy-delivery
  • Minimizes energy-costs
  • Minimizes on-site hydro-carbon emissions
6. Is adaptable to a variety of energy sources:
  • Where steam available – Steam to Fluid Heat Exchangers (HESF)
  • Where natural gas (or other energy available) - externally sited Central Heating Unit (CHU)
7. A system of Drying Environment Control Units (DECU) and fan coils which address:
  • High Efficiency Particulate Air Filtration (HEPA)
    • Fabric filters
    • Ultra-Violet light
  • Temperature control
  • Humidity Control / Dehumidification
  • Air Movement (cubic feet per minute)
  • Conditions for mould growth
Result
The ICS system responds to all items specified by LEED in the scope of work.The project direction changed and the designed system was not installed. You can experience the benefits of this solution if your next project has a similar challenge. Please enquire, we would be pleased to design and configure a solution specific to your needs.