Construction Heat

Interim Climate Control

COOL - COMPUTER SERVER ROOM
Several banks of computer servers were placed in a newly constructed room at the University of Alberta. The permanent HVAC system was not yet installed. The servers were operating in an environment ...
more

HEAT - INSTITUTIONAL HEATING REPAIRS
The geothermal hot water heating system of an Institutional building in a remote Northern Alberta location required to be shut down for maintenance. An interim heating system was required ...
more

HEAT- AQUATIC CENTRE
To interface with existing hot water circulation systems in the aquatic facility with ICS portable equipment to keep the aquatic facility operating while permanent equipment is taken off-line ...
more

OCCUPANCY DELAY INTERIM HEAT & HOT POTABLE WATER
Occupancy turnover date rapidly approaches while natural gas fuel supply services are delayed, leaving the permanent condominium systems unable to run and supply hot potable water or heat. ...
more

Grout Curing

CURE - GROUT CURE - SUMMER / FALL

Enhance grout curing in temperatures to minus 5 degrees C for cementitious grout laid between ceramic tiles on a busy rapid transit loading platform. ...
more