Interim Climate Control
| COOL - COMPUTER SERVER ROOM |
| Several banks of computer servers were placed in a newly constructed room at the University of Alberta. The permanent HVAC system was not yet installed. The servers were operating in an environment ... |
| more |
| HEAT - INSTITUTIONAL HEATING REPAIRS |
| The geothermal hot water heating system of an Institutional building in a remote Northern Alberta location required to be shut down for maintenance. An interim heating system was required ... |
| more |
| HEAT- AQUATIC CENTRE |
| To interface with existing hot water circulation systems in the aquatic facility with ICS portable equipment to keep the aquatic facility operating while permanent equipment is taken off-line ... |
| more |
| OCCUPANCY DELAY INTERIM HEAT & HOT POTABLE WATER |
| Occupancy turnover date rapidly approaches while natural gas fuel supply services are delayed, leaving the permanent condominium systems unable to run and supply hot potable water or heat. ... |
| more |
Grout Curing
| CURE - GROUT CURE - SUMMER / FALL | |
Enhance grout curing in temperatures to minus 5 degrees C for cementitious grout laid between ceramic tiles on a busy rapid transit loading platform. ... |
|
| more |